Embark on a journey through Mastrak’s transformative railway projects, where every endeavor is a testament to our commitment to excellence. From local developments reshaping the Malaysian landscape to international ventures leaving an indelible mark, Mastrak’s portfolio is a narrative of precision, innovation, and enduring quality.
Name of Project and Scope of Work |
Name of Client | Sleeper / Bearer Quantity | Period of Supply | Type of Sleeper / Bearer | Type of Fastening |
---|---|---|---|---|---|
KVDT - KLANG VALLEY DOUBLE TRACKING
(Design & supply of 1:9 and 1:15 Turnout) |
KTMB | 150 sets | 2017 to 2018 | TURNOUT BEARERS | VAE TRACK TECHNOLOGY |
EAST COAST REHABILITATION WORKS BETWEEN GUA MUSANG & KUALA
KRAI
(Design manufacture and supply of Pre Stressed Concrete Sleeper) |
TRACKWORK & SUPPLIES SDN BHD | 25,000 | 2017 to 2018 | Meter Gauge Normal & Guard Rail | Stedef SSA 64 |
KVMRT Phase 2 Sungai Buloh - Serdang - Putrajaya
(Design & Supply of Turnout Bearers of Various configuration) MAINLINE & DEPOT BEARERS |
Voestalpline VAE GmbH | 95 SETS of various configuration | 2018 to 2019 | TURNOUT BEARERS | VAE TRACK TECHNOLOGY |
LRT3 Shah Alam
(Design & Supply of Turnout Bearers of Various configuration) MAINLINE & DEPOT BEARERS |
Voestalpline VAE GmbH | 30 SETS (Mainline ) & 51 SETS (Depot) | 2021 to 2022 | TURNOUT BEARERS | VAE TRACK TECHNOLOGY |
Name of Project and Scope of Work |
Name of Client | Sleeper / Bearer Quantity | Period of Supply | Type of Sleeper / Bearer | Type of Fastening |
---|---|---|---|---|---|
Singapore MRT Gali Batu Depot (C9062)
(Design & supply of 1:9 and 1:15 Turnout Bearers) |
Voestalpline VAE GmbH | 11 sets | 2018 | Turnout Bearers | VAE Track Technology |
Ho Chi Minh City Metro
(Design & supply of 1:9 and 1:15 Turnout Bearers) |
Voestalpline VAE GmbH | 47 sets | 2017 to 2018 | Turn Out Bearers | VAE Track Technology |
Singapore MRT T250A
(Trackwork for Thomson-East Coast Line Stage 4 and 5, Downtown Line Stage 3 Extension and East-West Line Upgrade) (Design & Supply of Turnout Bearers of Various configuration) |
Voestalpine Railway Systems GmbH / CRFG | 170 sets of various configuration | 2020 to 2023 | Turnout Bearers (inc shallow depth) | VAE Track Technology |
Singapore MRT (C850E)
(Trackwork for Circle Line 6 and Depot Extension & North East Line Mainline and Depot Extension) (Design & Supply of Turnout Bearers of Various Configuration) Mainline & Depot Bearers |
Voestalpline Railway Systems GmbH / CR11-CC-Gates JV | 71 sets of various configuration & 37 sets wide bearers | 2021 to 2023 | Turnout Bearers (inc wide bearers for better noise/vibration control) | VAE Track Technology |
Singapore MRT R150
(Trackwork for Bishan Depot, Ulu Pandan Depot and Pasir Ris Rail Turnback) (Design & Supply of Turnout Bearers of Various Configuration) Mainline & Depot Bearers |
Voestalpline Railway Systems GmbH / PORR-Gates R150 JV | 7 sets | 2021 | Turnaout Bearers (inc shallow depth) | VAE Track Technology |
Singapore MRT J150
(Trackwork for Jurong Region Line) (Design & Supply of Turnout Bearers of Various Configuration) Mainline & Depot Bearers |
Voestalpline Railway Systems GmbH / CRFG | 113 sets ballasted & 118 sets non-balllasted slab track | 2022 to 2025 | Turnout Bearers (inc shallow depth) | VAE Track Technology |
Singapore MRT C190-ITTC (Integrated Train Testing Center)
(Design & Supply of Turnout Bearers of Various Configuration) Mainline & Depot Bearers |
Voestalpline Railway Systems GmbH / PORR-Gates R190 JV | 34 sets | 2022 to 2023 | Turnout Bearers (inc shallow depth) | VAE Track Technology |