Local and Global Impact Through Excellence

Transformative Railway Projects

Embark on a journey through Mastrak’s transformative railway projects, where every endeavor is a testament to our commitment to excellence. From local developments reshaping the Malaysian landscape to international ventures leaving an indelible mark, Mastrak’s portfolio is a narrative of precision, innovation, and enduring quality. 

2.6 million

sleepers produce

1,202 sets

turnout bearers

9,000

slabs produced

Track Record Within Recent 5 Years (2017 - 2022)

Local Projects (Malaysia)

Overseas Projects

Local (Malaysia)

Name of Project and
Scope of Work
Name of Client Sleeper / Bearer Quantity Period of Supply Type of Sleeper / Bearer Type of Fastening
KVDT - KLANG VALLEY DOUBLE TRACKING

(Design & supply of 1:9 and 1:15 Turnout)
KTMB 150 sets 2017 to 2018 TURNOUT BEARERS VAE TRACK TECHNOLOGY
EAST COAST REHABILITATION WORKS BETWEEN GUA MUSANG & KUALA KRAI

(Design manufacture and supply of Pre Stressed Concrete Sleeper)
TRACKWORK & SUPPLIES SDN BHD 25,000 2017 to 2018 Meter Gauge Normal & Guard Rail Stedef SSA 64
KVMRT Phase 2 Sungai Buloh - Serdang - Putrajaya

(Design & Supply of Turnout Bearers of Various configuration)

MAINLINE & DEPOT BEARERS
Voestalpline VAE GmbH 95 SETS of various configuration 2018 to 2019 TURNOUT BEARERS VAE TRACK TECHNOLOGY
LRT3 Shah Alam

(Design & Supply of Turnout Bearers of Various configuration)

MAINLINE & DEPOT BEARERS
Voestalpline VAE GmbH 30 SETS (Mainline ) & 51 SETS (Depot) 2021 to 2022 TURNOUT BEARERS VAE TRACK TECHNOLOGY

Overseas

Name of Project and
Scope of Work
Name of Client Sleeper / Bearer Quantity Period of Supply Type of Sleeper / Bearer Type of Fastening
Singapore MRT Gali Batu Depot (C9062)

(Design & supply of 1:9 and 1:15 Turnout Bearers)
Voestalpline VAE GmbH 11 sets 2018 Turnout Bearers VAE Track Technology
Ho Chi Minh City Metro

(Design & supply of 1:9 and 1:15 Turnout Bearers)
Voestalpline VAE GmbH 47 sets 2017 to 2018 Turn Out Bearers VAE Track Technology
Singapore MRT T250A

(Trackwork for Thomson-East Coast Line Stage 4 and 5, Downtown Line Stage 3 Extension and East-West Line Upgrade)

(Design & Supply of Turnout Bearers of Various configuration)
Voestalpine Railway Systems GmbH / CRFG 170 sets of various configuration 2020 to 2023 Turnout Bearers (inc shallow depth) VAE Track Technology
Singapore MRT (C850E)

(Trackwork for Circle Line 6 and Depot Extension & North East Line Mainline and Depot Extension)

(Design & Supply of Turnout Bearers of Various Configuration)

Mainline & Depot Bearers
Voestalpline Railway Systems GmbH / CR11-CC-Gates JV 71 sets of various configuration & 37 sets wide bearers 2021 to 2023 Turnout Bearers (inc wide bearers for better noise/vibration control) VAE Track Technology
Singapore MRT R150

(Trackwork for Bishan Depot, Ulu Pandan Depot and Pasir Ris Rail Turnback)

(Design & Supply of Turnout Bearers of Various Configuration)

Mainline & Depot Bearers
Voestalpline Railway Systems GmbH / PORR-Gates R150 JV 7 sets 2021 Turnaout Bearers (inc shallow depth) VAE Track Technology
Singapore MRT J150

(Trackwork for Jurong Region Line)

(Design & Supply of Turnout Bearers of Various Configuration)

Mainline & Depot Bearers
Voestalpline Railway Systems GmbH / CRFG 113 sets ballasted & 118 sets non-balllasted slab track 2022 to 2025 Turnout Bearers (inc shallow depth) VAE Track Technology
Singapore MRT C190-ITTC (Integrated Train Testing Center)

(Design & Supply of Turnout Bearers of Various Configuration)

Mainline & Depot Bearers
Voestalpline Railway Systems GmbH / PORR-Gates R190 JV 34 sets 2022 to 2023 Turnout Bearers (inc shallow depth) VAE Track Technology